Project Information

  Loacation : Kazakhstan

  Owner : Karabatan Utility Solutions Limited

  EPC : Doosan Heavy Industries & Construction

  Delivery Date : July 2017

  Item Name : Gas Metering System (w/ Steam Metering System)

  Quantity : 1 Sets

  Fluid : Natural Gas

  Design Pressure : 85 barg

  Design Temperature : 95

  Used Flowmeter : 8" Ultrasonic Flowmeter

  Flow Configuration : 2 Stream x 100%

  Piping Material : Carbon Steel (A106-B)

  Major Items : Ultrasonic Flowmeter, Manual Ball Valve, Control Panel, PG, PT, TG, TT & etc.